WORK

Most of the work is behind something.

Which is also the problem with photographing it. So here is a room you can take apart. Drag the line.

A finished mountain-modern great room: a large screen set flush into the plaster above a linear fireplace, a sectional, and a window onto the peaks. Nothing else of the system is visible.
The same great room drawn as an x-ray, showing the screen, in-wall speakers, conduit and cable runs concealed behind the finishes.
THE ROOMWHAT IS IN THE WALL

DESIGN STUDY · GREAT ROOM · DRAG THE DIVIDER

Gallery

Rooms we composed, not rooms we borrowed.

Design studies, not client homes, and we won’t pretend otherwise.

A living room with a board-formed concrete wall, oak cabinetry and a window seat, snow and peaks through a full-height glass wall

Stone House

Design study · Lighting + whole-home audio

Lighting held to scenes instead of switch banks, so the stonework, not the hardware, sets the mood.

A television lit in a dark panelled great room, speakers flush in the ceiling

The Wall Becomes the Picture

Design study · Cinema + concealed audio

A television set flush into oak millwork, surround speakers finished into the ceiling, blackout shades on the same scene button.

An equipment rack behind an open flush cabinet door, its front face solid and clear of cabling because every connection is made at the rear

The Part Nobody Sees

Design study · Network + rack

Every connection made at the back, so the front of the rack stays a clean face. Most of this trade patches the front. We do not.

Ceiling speaker grilles finished flush into a wood plank ceiling

Inside the Walls

Design study · Structured wiring

Speakers finished flush into the ceiling. The cable runs behind them were decided before the drywall went on.

Motorized shades lowering over a mountain window wall at dusk

One Button, Whole House

Design study · Scenes + climate

Arrive, Entertain, Cinema, Goodnight, Away, named in plain English on one keypad, so a guest never needs the app.

What you end up holding

A project is not finished when it works. It is finished when somebody else could service it.

  1. Device overlays

    Your floor plans, marked with every speaker, keypad, screen and drop, agreed before anything is ordered.

  2. Wire schedule

    What runs where, labelled at both ends, so the walls match the paperwork.

  3. Rack elevation

    The equipment room drawn and built off-site, then installed working.

  4. A walkthrough

    Standing in the room, in person. Not a manual and not a login.

Some of our best work can’t be photographed. Ask for a reference.

We’ll put you in front of the work itself: a room you can sit in, a system you can use, a homeowner or builder you can call.

Call usBook a Consultation